Carry out extensive undercroft and dock side repairs to a tidal structure whilst enabling the ferry service to remain operational. All repairs carried out under a survey and repair contract system. All repairs to concrete pillars and beams were patch and arris style incorporating a rebar protection and replacement system.

The rear undercroft wall required repairing and a tanking slurry system to further protect from water and carbonation ingress thus halting the further erosion of the structure. All lower beams were coated with a three layer carbon fibre wrap system that is completely impermeable to future attack and aids the self-supporting of larger repairs where mass erosion had taken place over time. A mixture of Flexcrete, Antel and Fosroc products were used in the completion of the works.