BTU Water Sites

Carry out extensive tank and water concrete channel system alterations including wall saw and slit cutting of concrete channels to alter the sizes to enable new screening machines and gate systems to be installed to control flows.

The project required the use of specialist tanking systems after concrete repair to enable an effective coverage of rebar against H2S attack due to the limited rebar cover achievable of around 10mm after work was completed. All works carried out using Flexcrete products

Accreditations