Boathouse 4 Portsmouth Historic Docks

Carry out extensive concrete repairs to the land based structure and marine based undercroft of the building, the project involved a survey and repair standard including patch and arris repairs of which most included rebar replacement or protection systems before reinstating concrete systems

The undercroft area of the structure was subject to tidal conditions so all products had to be able to cope with these conditions. Further to this a sacrificial anode system was installed into the concrete structure to act as a passive protection system that will give an anticipated future lifespan exceeding 40 years. All repairs carried out using Flexcrete products