Carry out extensive concrete repair works to include Fosroc Nitoseal crack injection systems, concrete breakout, rebar protection and reinstatement of concrete to a marine based tower platform and pier structure that holds an operational 800ft pylon tower in the Severn channel.

The structure has been subject to extensive concrete repairs throughout, the project included other works such as a complete resurfacing of the tower platform with a waterproof cementitious grouting that is self-levelling, a mass anode installation throughout (14,000 in total) and an anti-carbonation paint system on all concrete surfaces.

The initial repair survey data indicated around 1000+ repairs across the structure. All works carried out using Fosroc and Flexcrete products.